Secure
the HydroFLOW unit firmly to the pipe using ties
provided.
The ties are
installed through the slots incorporated in the lower section
of both end caps, passed around the pipe end secured, (see
illustration below). Warning: the ties are
non-removable, so do not attempt to connect them until installation
is required.
Fit hexagon
nuts into the holes provided in the end plate, next to the
ferrite retaining cage, (see illustration below). Where the
installation is on a vertical pipe, it is recommended that
the unit is fitted with ferrite cage uppermost to ease fitting
of hexagon nuts.
Insert a long
ferrite bar through aperture in retaining cage until both
holes line up with the two hexagon nuts in the end plate (see
illustration below).
Take second
ferrite and line up with hole in ferrite through retaining
cage, insert plastic bolt through both ferrite bars and tighten
into hexagon nut. Assemble other ferrite's around pipe (see
illustration below) and secure with plastic nuts and bolts,
making the final connection into the hexagon nut on the other
side of the ferrite cage. Tighten all nuts and bolts until
hand tight, do not over-tighten.
Install Power
Supply Unit (P.S.U.) in a convenient position adjacent to
the mains electric (90V-260V) supply point, so that the LEDs
can be easily viewed. A special extension cable can be obtained
from the supplier if required.
Connect to
mains (see IEE wiring instructions). Switch on mains supply
and ensure that the red and green L.E.D.s are glowing brightly
on the P.S.U.
|